Home |
Search |
Today's Posts |
#1
Posted to rec.audio.pro
|
|||
|
|||
lifting ground at patchbay
i'm installing a new system and have found that some of the gear needs
the signal ground lifted. should i do this at the patchbay or the gear side? what should be done about the mixer (balanced) to pathcbay connection (all mixer i/o go to patchbay) ? -i've read that grounds should be connected at mixer and lifted at gear but i'm not sure how this applies when a patchbay enters the situation. |
Thread Tools | |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
common mode rejection vs. crosstalk | Pro Audio | |||
Topic Police | Pro Audio |